Skip to content
website logo
  • >  News
  • >  Case Studies
    • South West Inverness Flood Prevention Scheme
    • Urban Stream Restoration
    • Owens Lake Dust Mitigation Project
    • Rewind Scotland Festival 2012
    • Equipping a once-fatal highway
  • >  Contact Us
  • Log In
  • Home
  • Sustainability
    2023-10-27_08-42-21 cropped 4_3 image
    Energy Management
  • Rigid Containers
    p1f2j4c2e55c7m426l2c1hlt42g_X50Y50_1920 (1) cropped 4/3 image
    Round and Oval
    square-and-rectangular-1 image
    Square and Rectangular
    special-containers-1 image
    Special Containers
  • FIBC
    fibc-reel-bags-tonne-bulk-big image
    Reel Bags for Automatic Filling
    loop-bags-big-2-1 image
    1- and 2-Loop Bags
    4-5-loop-bags.jpg-cropped image
    4- and 5- Loop Bags
    automatic-big-bag-filling-solutions-3-1 image
    Filling & Handling Solutions
  • Packaging Films & Bags
    pallet-covering image
    Pallet Covering / Film
    woven-bags image
    PE / PP Woven Bags
    heavy-duty-bags-1 image
    Heavy Duty Bags
    packaging-solutions-ireland cropped 4/3 image
    Packaging Solutions
  • Geotextiles
    construction-2 image
    Construction
    geosynthetics-1 image
    Geosynthetics
    agri-horticulture-aquaculture-1 image
    Agri / Horticulture / Aquaculture
    ground-cover image
    Ground Cover / Weed Fabric / Wind Break
    industrial-fabrics-1 image
    Industrial Fabrics
    industrial-yarns-fibres-1 image
    Industrial Yarns Fibres
Skip to content
website logo
  • Home
  • Sustainability
    • Energy Management
  • Rigid Containers
    • Round and Oval
    • Square and Rectangular
    • Special Containers
  • FIBC
    • Reel Bags for Automatic Filling
    • 1- and 2-Loop Bags
    • 4- and 5- Loop Bags
    • Filling & Handling Solutions
  • Packaging Films & Bags
    • Pallet Covering / Film
    • PE / PP Woven Bags
    • Heavy Duty Bags
    • Packaging Solutions
  • Geotextiles
    • Construction
    • Geosynthetics
    • Agri / Horticulture / Aquaculture
    • Ground Cover / Weed Fabric / Wind Break
    • Industrial Fabrics
    • Industrial Yarns Fibres
  • > News
  • > Case Studies
  • > Contact Us
Your browser appears to have JavaScript disabled. We use JavaScript to provide essential functionality on this website. Please enable JavaScript in your browser settings.
Share

South West Inverness Flood Prevention Scheme

Home  /  Case Studies  /  South West Inverness Flood Prevention Scheme

Project

The South West Inverness Flood Prevention Scheme has been a four-phase, multi-million pound project. The final phase of the £16 million south west Inverness flood relief channel lies between Oldtown of Leys and the Alt na Skiah Burn to the south of Fairways golf course. The scheme intercepts four watercourses; Lochardil Burn, Slackbuie Channel, Slackbuie Springs and Alt na Skiah Burn and channels the waters into the River Ness, via the Holm Burn. Phase 4 spanned a length of 1.6km, comprised of 50% open channel and 50% closed box culvert. The scheme diverts water from the south of the town, around the local community housing and into the River Ness.


Project Design

The main contractor RJ McLeod faced a number of key issues including:

Deep excavations, including some in poor ground conditions
Extensive service/public utility works, including a high pressure water main diversion and several service crossings
Working in and alongside existing watercourses including ecological and archaeological constraints (source www.rjmcleod.co.uk)
Don & Low supplied Lotrak® geosynthetics for two different applications in the flood channel

Lotrak® 200, a medium-weight mechanically bonded (needlepunched) nonwoven geotextile, with increased strength and filtration properties, to be positioned between the Class 6U confinement layer and the geosynthetic clay liner (GCL)
Lotrak® 70R, a high-strength woven reinforcing geotextile, to be used so as to separate the heavyweight rock armour from the Class 6U confinement layer

The Result

The function of Lotrak® 200 was to protect the geosynthetic clay liner (GCL) during the installation of Type 6U stone and to provide stabilisation. Lotrak® 70R was installed for separation and reinforcement of rock armour, while offering protection to the lower layers of the installation. The works were designed by AECOM based in Leeds and supervised by Highland Council.

We use cookies to tailor your web browsing experience. By accepting the below and continuing to browse our site, you agree to our privacy policy.

TOP >
Thrace Synthetic
057 933 1282
info@thrace.ie
> Cookie Policy > Disclaimer
website logo
Copyright © 2025 Thrace Synthetic. All Rights Reserved.
Powered by website logo